
1928: ECM, "Etudes et Constructions Mécaniques", originally Ugine Infra, was founded
1964: ECM started the development of vacuum-furnace technology for high steel-grade brazing applications in aeronautics.
1980: Initial tests of low pressure carburizing and gas quenching
1983: Photovoltaic , development of the first furnace (for polycristaline ingot 60 kg) with Photowatt
1990: Vacuum furnace Hercule 2400°C for Hermes Aerospace, 2400°c , useful volume 8m3
1992: Foundation of ECM Beijing
1997: Contract for 5 furnaces for Photovoltaic silicon ingot of 240 kg for Photowatt
1998: 1st ICBP Horizontal ,vacuum carburizing furnace for mass production of gear boxes, including 20 bar gas quenching device.
1998: Foundation of ECM USA at Kenosha Wisconsin
1999: Nuclear, furnace for MOX sintering
2001-2004: Photovoltaic : Contracts of 22 bottom loading furnaces for Deutsch